Winter
2012
|
||
13
|
During
the design phase of the system development life cycle many issues need to be
considered. Other than design of hardware, describe in detail four features
or processes which should be considered when designing a new computer system.
|
[8]
|
Summer
2012
|
||
13
|
A
systems analyst is called in to give advice after a new ICT system is
implemented. Describe, using examples, four maintenance issues that could
have arisen.
|
[8]
|
Winter
2013
|
||
14
|
When
developing a new computer system, a systems analyst will have to investigate
to produce the feasibility report. Describe what will be investigated in
order to produce this report.
|
[5]
|
15
|
Once a
new computer system has been designed, it has to be implemented. Discuss two
different changeover strategies that an organisation could use for conversion
to the new system.
|
[6]
|
16
|
Once
the new computer system is up and running, it has to be maintained. Describe
two different system maintenance methods and illustrate each method with
appropriate examples.
|
[6]
|
Summer
2013
|
||
13
|
A
systems analyst is investigating a company with regard to creating a new ICT
system. Describe three methods she would use to gather information
about the existing system.
|
[9]
|
Winter
2014
|
||
4
|
A
system analyst has a choice of direct changeover or parallel running when
updating a computer system. Describe these two different potential changeover
strategies and describe the advantages and disadvantages of each of the
different strategies.
|
[6]
|
Summer
2014
|
||
12
|
A
company has installed a new ICT system which will have to be maintained.
Describe two different methods of system maintenance, illustrating each
method with an appropriate distinct example.
|
[2x3]
|
Summer
2015
|
||
8
|
A
system analyst has been employed by a council to produce a new computer based
system to replace the system currently running their central lending
library. Other than observation, describe two methods the analyst could use to investigate their current system.
|
[2x3]
|
10
|
A
doctors’ practice has installed a new computer system to help run the
practice. Once this system is up and
running, it has to be maintained.
Describe three different
methods of system maintenance and
illustrate each method with
appropriate examples.
|
[3x3]
|
Labels
- IT1
- IT3
- Database systems
- HCI
- Networks
- Capabilities
- Data Info Knowledge
- ICT in business
- ICT in education
- ICT in healthcare
- ICT in the home
- Internet
- Limitations
- MIS
- Management of change
- Modelling
- Presenting information
- Quality Information
- Security Policies
- Social issues
- Systems development
- Validation
- Verification
- Working with ICT
- life cycle
Wednesday, 7 October 2015
IT3: Topic 9 - Systems development life cycle
Labels:
IT3,
life cycle,
Systems development
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment